An installer catches a labeling miss before the AHJ does
The crew completes a residential array and runs the guided capture: rapid shutdown placard, conductor labeling, combiner, and meter socket. The remote QA reviewer spots a missing placard on the live session and the crew corrects it in five minutes. The jurisdictional inspection passes first time instead of triggering a two-week re-inspection cycle.