A regional bank clears a stalled foundation draw in a day
A builder submits a foundation draw on a Friday. The reviewer flags that the submitted photos do not show the rebar tie-in. Instead of ordering a third-party inspection for the following week, she sends a live link to the superintendent Monday morning. He walks the footing on his phone, she circles two areas on the live frame, and the captured stills — geo-locked to the parcel — attach to the draw file. The draw funds that afternoon.